Northeast Trail - Segment 1

The full Northeast Trail – Segment 1 runs 0.9 miles from Monroe Drive to Westminster Drive, including a portion along the Carriage Trail through Piedmont Park. The full trail segment officially opened with a groundbreaking on November 12th.

Project Status

The plaza work at 10th and Midtown as well as the bike lane are complete. Railing along Carriage Trail is complete. Trees are now installed. Groundcover and shrubs will be installed throughout the summer.

Project Timeline

  • May 2020 - July 2021: Alternatives analysis and concept validation

  • July 2021: Locally Preferred Alternative as part of the federally funded, full length of the Northeast Trail design project

  • July 2021: Execute contract for design phase services

  • September - October 2021: Gravel installation along unpaved path

  • August 2023: Groundbreaking and construction start

  • November 2024: Trail opened to the public